PDF Establishing Theoretical and Target Values for Density and Moisture Content <>
ICC Soils Special Inspector Certification Test Training | SI Certs hV[oH+hz3HJ 296 0 obj
<>
endobj
lift) = 13 tests required (minimum) (Answer) Backfill around Manholes (minimum) One test every fourth compacted lift around the perimeter; beginning after the first 4 inch compacted lift above the bedding and continue to 5 feet below the top of the structure.
VDOT: Soils and Aggregate Compaction - Community College Workforce Alliance Submit, SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. 282 0 obj
<>
endobj
Vdot Soils And Aggregate Compaction - Fill Online, Printable, Fillable 2016v1.0 Chapter 4 4, 5 PRE CONSTRUCTION ISSUES Prior to construction the pipe delivered to the project should be inspected and verified to be the pipe specified for the project. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. No. For more information about taking the . SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. The side is called the drainage side. 10) Backfill the trench using clean #8 or #57 aggregate as soon as practical, but not later than the end of each working day. This happens because large pores more effectively move water downward through . ;5&6+Hv:#'Wg}]V.0;'|[c
9tD8XN[
|v(0|pemRS=v1VNc`j
VDOT Soils Flashcards | Quizlet SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. If it is a routine entrance, or crossover pipe 12 to 30 in diameter, that is to be installed under fills 15 feet or less in height, no exploration is needed. endstream
endobj
startxref
Similarly, VDOT will recognize NICET Construction Materials Testing Level II Certification in Concrete. Fill out, edit & sign PDFs on your mobile, Description of vdot soils and aggregate compaction, Related Forms True or false: A soil that contains a high percentage of fines is more affected by water that one with a low percentage of fines.
%PDF-1.5
%
endobj
142 0 obj
<>/Filter/FlateDecode/ID[<40D256C358E2674187D5A8FC321FC95C>]/Index[129 27]/Info 128 0 R/Length 70/Prev 587873/Root 130 0 R/Size 156/Type/XRef/W[1 2 1]>>stream
What term refers to the texture and firmness of a soil? Geotechnical Bulletin PLAN SUBGRADES, SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS, SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES, Specification Guidelines: Allan Block Modular Retaining Wall Systems, Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS, SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, Click here to access guidelines for the VDOT Materials Certification Schools Program (Section 114, Manual of Instructions), ACI Concrete Field Testing Technician Certification Program Schedule, Nuclear Radiation Certifications can now be obtained online through third party vendors, Pavement Marking (only available as an online course), Asphalt Plant Level 1 - Physical demonstration of proficiency -scheduled byGermanna CC, Asphalt Plant Level 2 - Physical demonstration of proficiency - scheduled by Germanna CC, Asphalt Plant Mix Design - Physical demonstration of proficiency - scheduled by Germanna CC, Concrete Field - Current ACI must be submitted to, Soils and Aggregate Compaction - Physical demonstration of proficiency - scheduled by CCWA. 17) What is the minimum amount of cover over pipe allowed for design loads? American Water Works Association As stated earlier, soils are made up of many different types, shapes and sizes of particles. VECAT,through Germanna Community College (GCC), is hosting the following courses, which are now available either online or in a face to face format: For more information on courses and registration click here or contact Judith Calvert, 540-937-6757. VDOT Soils and Aggregate Compaction: Chapter 3. ITEM NO. - 2000, Related Features VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1 When moving concrete pipe you should pick it up by one end. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. Traffic information for existing VDOT maintained roadways can be obtained at the following internet Dense graded aggregates are used in pavement to give the structure more strength. protection. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal, SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. endstream
endobj
283 0 obj
<>
endobj
284 0 obj
<>
endobj
285 0 obj
<>stream
Portion of Section 2102 . Length of run = 856 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 3) (36 in. These heavy loads can cause considerable damage in flexible pipes and can cause D load cracking in rigid pipes. Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. Deficiencies found may include: but are not limited to, the following: Crushed, collapsed or deformed pipe or joints Alignment defects Improper Joints (allow infiltration of soil) Misaligned joints (allow debris accumulation) Pipe Penetrations (guardrails, utilities, etc.) VDOT : Central Mix Aggregate Plant with Proficiency - FULL PRICE NON VIRGINIA RESIDENTS, CCWA - Workforce Development and Conference Center, VDOT SELF-STUDY: Central Mix Aggregate Plant with Proficiency, VDOT SELF-STUDY: Soils and Aggregate Compaction, VDOT: Central Mix Aggregate Plant with Proficiency, VDOT: Documentation and Recordkeeping for Inspectors. Use units conforming to the dimensions, SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. Grades and certifications are issued within 15-30 business days after the testing date. This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia.
PDF Pavement Design Guide for Subdivision and Secondary Roads in Virginia materials (soils, aggregate and asphalt) in the field, the Geotechnical firm shall be responsible for the continuous monitoring of the placement and compaction of aggregate base materials, asphalt concrete pavement and the placement and compaction of earthwork and backfill of trenches and structures to ensure compliance with the Specifications. 1 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL LEARNING OUTCOMES Understand basic pipe and soil concepts and how they relate to preconstruction issues Understand fundamental trench concepts and pipe installation procedures Understand . As a reminder, all certification courses are available either online or through a self-study option at the respective community colleges. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. A mandrel is needed for Flexible Pipe to measure deflection. If the inspection is to be conducted with a video camera, the video camera shall have fully articulating lenses that will provide a 360 degree inspection of the pipe/culvert, including each joint and any deficient areas of the pipe/culvert, as well as a means to measure deformations/deflections of the pipe (items such as a laser range finder or other appropriate device for taking such measurements as specified herein and approved by the Engineer). The components of an underdrain system are: 1) Trench 2) Non woven geotextile drainage fabric 3) Perforated longitudinal pipe (min. Walls that carry extra, TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines, SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe Testing Frequency Example 1: Pipe Diameter = 48 in. PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. From this we can highlight the following requirements: Visual/ Video Inspection is required on: All Storm Sewer Pipes (100%) Selected Number of Pipe Culverts (>10%) 2016v1.0 Chapter 4 15, 16 Must be done with VDOT Rep Present Conducted no sooner than 30 days after completion of Installation and placement of final cover (except pavement).
1-2023 Transportation Construction Office Engineer SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. ]1YW'; q=A D0Yf BD0A8 Dh s @!2au28!w)#Nb=` L
*w @y7![RYT6 Ke`riO05 ~z
False. 2016v1.0 Chapter 4 14, 15 POST INSTALLATION INSPECTION The following is an excerpt from Virginia Test Method 123 Post Installation Inspection of Buried Storm Drain Pipe and Pipe Culverts covering the scope of post installation pipe inspection. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20, RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover, SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. = 15 lifts 5) 15 ifts 2 (one test every other lift) = 7.5, round up to 8 tests in the top 5 ft. of backfill 6) Total tests required = (Number of test below 5 ft.) + (Number of test above 5 ft.) 7) = 11 tests required (minimum) NOTE: Compaction Tests are required on stone backfill (Class I backfill and bedding material); consult the District Materials Division for Maximum Dry Density and Optimum Moisture Content targets for the specific material being used. The fill above the top of the regular backfill shall be installed and completed as specified for embankment construction. STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. 3) 104 in. Silt Tight: A joint that is resistant to infiltration of particles that are smaller than particles passing the No. 794 (d), please call 800-367-7623. Manhole Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) 5 ft. = Depth of Backfill below top 5 feet 1) 9 ft. 5 ft. = 4 ft. 2) 4 ft. x 3 lifts/ft. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials, To make this website work, we log user data and share it with processors. Natural ground slope, PIPE INSPECTION AND REPAIR.
Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW), CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Generally excavated embankment material is used as the final backfill. of the rammer used to compact the soil or soil and aggregate mixture in the mold and the number of layers placed into the compaction mold for compaction. %PDF-1.5
%
Fill Vdot Soils And Aggregate Compaction, Edit online. Trench excavation, backfill, and compaction; Section 02250. (Zero Air Voids = ZAV). When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. If the mandrel test is to be performed to mechanically measure deformations/deflections of the pipe/culvert, the mandrel used shall be a nine (or greater odd number) arm mandrel, and shall be sized and inspected by the Engineer prior to testing.
CON 310 Soils and Aggregates (Soils and Compaction) Homework Name:_____ 1) Why is it important for material testing technicians understand how to perform both the nuclear density test and the sandcone test for compaction testing? Dense graded means that the particles in the mixture are sized do that they fill most of the voids; there is very little space between the soil or stone particles. 5) True or False.
TABLE OF CONTENTS. OPEN CHANNELS 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT, SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE.
VDOT: Soils and Aggregate Compaction - Community College Workforce Alliance Minimum/Maximum Cover All Culverts 24 minimum cover Absolute minimum fill height (12 ) Except for entrances (9 minimum) All pipe should have three feet of cover on it before construction traffic is allowed across it. (Road and Bridge Spec. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. M`RyK?77&kr7#q*Xg`QU0iFfu{8nWW0-dNGC2lC8IA]uuLq\_gyxlP%n%[et:eR%iXebrq-b#[3'mAgh*ofmYe`4"7ex2j-RUi*LBI+KIyU9/S(zh2=m6|Em0.oaIvJI>a$ACDMSDq;~7Qj=i~=+eV39CB9vq,v=WTusaO.TVDP)v`y':PsASO&QePN27=RffF)fM{IUY_82 9Z0:}t8hc>C[U\sDK lUh"(o)
0N*5"ziE^ Yr*bgubM@/6Elg[r9o0p ;I(|)sX\(v2r. Virginia Department of Transportation documents: Road and Bridge Specifications and appropriate supplemental specifications Virginia Test Methods Manual Road and Bridge Standards. Students are required to register for classes on the GCC and/or CCWA web sites. kYPPc^KZ\"}JT9VBd[
/Le UJs]VOk:SZ If the soils is 100 percent saturated and has low MC. The function of the pipe, the soil type present in the trench, the depth of the pipe can all influence the type of pipe selected. large void spaces and is loosely compacted.
VDOT: Soils and Aggregate Compaction - Community College Workforce Alliance hbbd``b`~$CC`LZ eQ@dq
;&F d}0 Other methods of stabilization, such as geo fabrics may be appropriate based on the engineer s judgment. A REVIEW OF THE USE OF RECLAIMED ASPHALT - Read online for free. 11) Pipe openings in precast drainage structures shall not exceed the outside cross sectional dimensions of the pipe by more than how much? 3 ft. 2e\o ngV10J6q`pp)|Hpm3@BF >
endobj
298 0 obj
<>
endobj
299 0 obj
<>stream
A. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. Fine particles are more sensitive to the presence of water than coarse particles. SOILS AND AGGREGATE COMPACTION FIELD CERTIFICATION STUDY GUIDE 2016 Prepared By: The Virginia Department of Transportation (VDOT), Materials Division Note: The information included in this manual is generally compatible with current VDOT Road and Bridge Specifications; however, it should not be considered or used as a primary reference for VDOT Senior Transportation Construction Inspector to join us in VDOT's Northern Virginia to inspect all phases of construction on highway construction and maintenance projects.To oversee, monitors . The joint consists of a tongue (male end) and groove (female end) with no defining areas for gasket material placement. Drop Inlet Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) x 12 inches /foot = Depth of backfill in inches 1) 9ft. 16) What is the level of compaction required for pipe backfill? A standard Video/ Digital Camera can be used. The cost estimates, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer.
ASTM D6938 Standard Test Methods for In-Place Density and Water Content SECTION 02630 STORM DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Length of run = 275 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 1) (48 in. - 2000, If you believe that this page should be taken down, please follow our DMCA take down process, Something went wrong! This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with, Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. The Contractor shall report findings of foundation exploration to the Engineer for approval prior to placing pipe. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, APD Instructional and Informational Memoranda, Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, AASHTOWare Project Preconstruction (AWP-P) Manual, Construction Instructional and Informational Memoranda, Instructional and Informational Memoranda, Alternative Intersection Informational Design Guides, LD Instructional and Informational Memoranda, PMO Instructional and Informational Memoranda, Pollution Prevention Field Guide for Construction Activities, Roadside Development Report Excel spreadsheet tool, Nutrient Management Plan for Construction Projects, Nutrient Management Plan for Roadside Management, VDOT BMP Maintenance Manual Appendix C - Plant Palette Tables, Materials Certification School Information, Guide to the Traffic Impact Analysis Regulations, Land Development Inspection Documentation Best Practices Manual, OD Instructional and Informational Memoranda, Guide Manual for Causes and Repair of Cracks in Bridge Deck, Traffic Calming Guide for Neighborhood Streets, Manual on Uniform Traffic Control Devices (MUTCD), TED Instructional and Informational Memoranda, VDOT Traffic Operations and Safety Analysis Manual (TOSAM), Instructional and informational memoranda, Manual for the Procurement and Management of Professional Services. STORM SEWER CALCULATIONS 7-4 7.6. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. 12) How long after installation is complete can the video inspection can be done? 5) Open only as much trench as can be safely maintained by available equipment. Another option with the flared bell is the Modified Tongue & Groove, or Baby Bell which is a cross between a straight walled T&G and a Standard Bell it does not stick out from the barrel as far as a flared bell. It is generally easier to install due to less stringent lubrication requirements for the gasket. In a rigid pipe, this zone has zero effect on the load carrying capacity. SOILS COMPACTION AND TESTING 2015 Technical Training & Certification Program . The mandrel shall be fabricated of metal, fitted with pulling rings at each end, stamped or engraved on some segment other than a runner with the nominal pipe/culvert size and mandrel outside diameter. Having one of these functions without the other is worthless.
VDOT Soils and Aggregate Compaction 2016v1.0 Appendix C | 5 x 12 in./ft. 6.2 PIPE PVC gravity sewer pipe and fittings, SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General 1 1.01 Work Included 1 1.02 Related Requirements 1 1.03 Reference Standards 1 1.04 Quality Assurance 1 1.05 Measurement And. Rubber gaskets may be used when the joint slope is five degrees or less, however it is usually limited to mastic or butyl sealants. VDOT Materials Certification Schools. Consistency refers to the texture and firmness of a soil. After pipe installation and prior to backfilling, plugs shall be installed from the exterior of the pipe or box culvert and snugly seated. Contractor shall be responsible for all utility fees. Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections, CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer. 2) 108 in. back to courses page. The Soils and Aggregate Inspector Certification Course is designed for those individuals responsible for the sampling and testing of soils and aggregates used in base, subbase and roadway embankment construction. The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. All materials, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices, CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. SECTION LS 2530 SANITARY SEWERS. 1 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL LEARNING OUTCOMES Understand basic pipe and soil concepts and how they relate to preconstruction issues Understand fundamental trench concepts and pipe installation procedures Understand inspection requirements and backfill testing frequencies and procedures Understand the basic principles of pavement drain construction INTRODUCTION A well installed pipe should stay in service 50 to 100 years with little or no repair. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.